Article ID: fcc-starmind-orbital-data-centres-2026-11-26 · Revision: r2 · Status: published 26 November 2026 after an independent review of the staged text, whose SHA-256 is filed with this story, and after the publication gate accepted the tree.

Evidence table

KeySourceURLRetrieved
S1FCC news release, “FCC Authorizes 1 Million Satellites for Data Centers in Space” (DOC-427572A1)https://docs.fcc.gov/public/attachments/DOC-427572A1.txt2026-11-26
S2FCC Memorandum Opinion and Order and Authorization, DA 26-1273, ICFS SAT-LOA-20260108-00016https://docs.fcc.gov/public/attachments/DA-26-1273A1.txt2026-11-26
S3CNBC, SpaceX FCC satellite approval (Lora Kolodny, Annie Palmer)https://www.cnbc.com/2026/11/25/spacex-fcc-satellite-approval.html2026-11-26
S4Ars Technica, The FCC has authorized SpaceX to deploy 1 million satellites (Eric Berger)https://arstechnica.com/space/2026/11/the-fcc-has-authorized-spacex-to-deploy-1-million-satellites/2026-11-26
S5FCC 26-64, NEPA Report and Order, released 1 October 2026 — cited by S2 at paras. 62-69; not separately retrievedcitation appears in S2: https://docs.fcc.gov/public/attachments/DA-26-1273A1.txt2026-11-26
ClaimSourceStatus
The FCC authorised a 1,000,000-satellite NGSO constellation in orbital shells of 50 km span at altitudes from 500 to 1,002 km.S2VERIFIED
The authorisation was adopted and released on 25 November 2026 by the Chief, Space Bureau, under ICFS File No. SAT-LOA-20260108-00016, Call Sign S00798.S2VERIFIED
The disposition is “GRANTED-IN-PART/DEFERRED-IN-PART – With Conditions”.S2VERIFIED
The news release states that the system “operates consistent with the FCC's orbital debris rules”.S1VERIFIED
The order defers SpaceX's request for waiver of the atmospheric re-entry disposal rule.S2VERIFIED
The stated ground for deferral is that SpaceX has not provided sufficient information for the Commission to determine whether its alternative disposal methods comply.S2VERIFIED
Deployment of any satellite above 600 km is conditioned on a further modification application containing a final orbital debris mitigation plan.S2VERIFIED
The Commission found the debris plan for satellites below 600 km compliant, and made no such finding above 600 km.S2VERIFIED
Six nominal shells are listed: 550-568, 565-585, 686-718, 707-744, 946-978, 967-1002 km.S2VERIFIED
Two of the six shells lie entirely below 600 km and four lie entirely above it.S2 (arithmetic on the order's shell list)VERIFIED
The four shells above 600 km therefore cannot be deployed under this authorisation as written until SpaceX files a modification and the Commission rules.S2 (para. 11 applied to the shell list)VERIFIED
The release states no conditions, altitude limits or deployment milestones.S1VERIFIED
Radiofrequency authority is limited to backup and emergency TT&C in 18.8-19.3 GHz downlink and 28.6-29.1 GHz uplink, on an unprotected and non-interference basis.S2VERIFIED
Starmind will rely on optical links for its communications.S2VERIFIED
Conditions 1 and 2 require cessation of operations causing documented harmful interference and accommodation of future federal systems.S2VERIFIED
Condition 3 requires coordination with national-security and safety-of-life agencies before 18.8-19.3 GHz operations.S2VERIFIED
Condition 6 requires semi-annual reports on conjunctions, manoeuvres, removals, re-entries, deployment totals and band usage.S2VERIFIED
The Commission declined to cap station numbers, stating it would not “invent a de facto rule” in a licensing proceeding.S2VERIFIED
Carr is quoted saying “America is leading the world into the era of super intelligence.”S1VERIFIED
The release describes the grant as bringing “the human race closer to a Kardashev II civilization”.S1VERIFIED
SpaceX withdrew its request for waiver of milestones altogether in favour of the FCC 26-47 schedule.S2VERIFIED
The Commission granted a waiver of the surety bond and milestone requirements under part 25.S2VERIFIED
The deployment schedule is printed in DA 26-1273 itself: one station by 25 November 2033, 10% by 25 November 2035, 50% by 25 November 2038, remainder by 25 November 2040.S2, Condition 10VERIFIED — quoted directly from Condition 10, which states the operative deadlines and voids the authorisation if they are missed
The 100,000 figure is the order's own 10% of a million; Ars Technica reports the 2035 and 2040 dates and omits the 2038 milestone.S2, S4VERIFIED — the percentage is from Condition 10, and the omission was checked against the Ars text
“Roughly 50-fold” increase in satellites in orbit.S4 (Ars Technica)PARTIAL — outlet arithmetic, not an FCC statement
The Commission declined further NEPA review by reference to its October 2026 NEPA Order, FCC 26-64 at paras. 62-69.S2VERIFIED
The NEPA Order concluded that Commission-licensed space-based operations are extraterritorial activities and not a major Federal action.S2's description of S5PARTIAL — description appears in S2; FCC 26-64 not separately retrieved
The Commission dismissed record arguments that it must conduct an environmental review.S2VERIFIED
Launch-emission impacts are described as outside the Commission's purview.S2VERIFIED
Re-entry burn-up impacts are described as speculative and not supported in the record.S2VERIFIED
On optical astronomy the Commission found SpaceX's coordination commitments "sufficient to alleviate concerns on the record", and separately relied on its earlier holding that the rules do not address optical astronomy.S2, paragraph 16VERIFIED — quoted from paragraph 16; two grounds, only one jurisdictional
AAS infrared and thermal-signature concerns were found outside the scope of the RF operations.S2, paragraph 17VERIFIED
Petitions to deny were filed by Kuiper Systems LLC (Amazon Leo), Viasat Inc. and the American Astronomical Society.S2, paragraph 2; S3 (CNBC)VERIFIED — named in the order's own recital; petitions themselves not retrieved
All three petitions to deny were denied by name, and the order engages their substance at paragraphs 16-17 and 5/10/12.S2, ordering clause 20VERIFIED — quoted directly from clause 20
Neither document states compute capacity, power draw, cooling design, cost per satellite, launch cadence or financing.S1, S2 (absence checked)VERIFIED
Neither document finds the system technically or economically viable.S1, S2 (absence checked)VERIFIED
The release states the Commission is continuing to review additional orbital data centre proposals.S1VERIFIED

Verbatim quotation ledger

Every quotation in the body appears below with its exact source wording, unchanged from the document named and retrieved on 26 November 2026. Quotation marks in the body are typographic; the words between them are not.

IDSourceVerbatim textWhere it appears in the source
Q1S1 FCC news releaseThe system also operates consistent with the FCC's orbital debris rules.Release body, description of the Starmind system
Q2S2 DA 26-1273MEMORANDUM OPINION AND ORDER AND AUTHORIZATIONDocument title line
Q3S2 DA 26-1273GRANTED-IN-PART/DEFERRED-IN-PART – With ConditionsHeader disposition line
Q4S2 DA 26-1273Non-geostationary satellite orbit (NGSO) constellation of 1,000,000 satellites deployed into orbital shells each spanning 50 km at altitudes from 500 to 1,002 km and in 30-degree inclinations and sun-synchronous inclinations.Grant block, orbital parameters
Q5S1 FCC news releasethe FCC is granting SpaceX authorization to deploy 1,000,000 orbital compute modules to process massive amounts of data to be used back here on Earth.Release body, description of the grant
Q6S2 DA 26-1273the Commission's rules do not place limits on the number of space stations that can be authorized with similar orbital parameters and the Space Bureau declines to invent a de facto rule in this adjudicatory licensing proceeding.Paragraph 10
Q7S1 FCC news releaseAmerica is leading the world into the era of super intelligence.Chairman Brendan Carr, quoted in the release
Q8S1 FCC news releasepromises to bring the human race closer to a Kardashev II civilization—one that can harness the full power of the sun.Release body, description of the grant
Q9S2 DA 26-1273SpaceX's request for waiver of the Commission's rule requiring that satellites ending their mission below 2000 km be disposed of via atmospheric re-entry is DEFERRED.Condition 4
Q10S2 DA 26-1273Because SpaceX has not provided sufficient information for the Commission to determine whether its alternative disposal methods are compliant with the Commission's requirements, SpaceX's waiver request is deferred.Condition 4
Q11S2 DA 26-1273must file an application for modification of this authorization and provide sufficient justification for any requested waiver(s) of the Commission's rules.Condition 4
Q12S2 DA 26-1273We find that SpaceX's orbital debris mitigation plan for Starmind satellites that will operate below 600 km complies with the Commission's orbital debris mitigation rules.Paragraph 11
Q13S2 DA 26-1273We therefore condition this grant on SpaceX filing an application for modification containing its final orbital debris mitigation plan, responsive to all elements of the Commission's rules, prior to deploying any Starmind satellites that will operate at altitudes above 600 km.Paragraph 11
Q14S2 DA 26-1273originally requested waiver of the Commission's milestone requirements altogether but withdrew that request in favor of its request to apply the new milestones adopted in the Space Modernization R&O and FNPRM.Paragraph 9
Q15S2 DA 26-1273it is in the public interest to grant a waiver of the surety bond and milestone requirements under part 25 for SpaceX's system.Paragraph 9
Q16S4 Ars Technicaroughly 50-foldStandfirst, describing the increase in satellites in orbit
Q17S2 DA 26-1273Consistent with the Commission's October 2026 Report and Order in the Modernizing the Commission's National Environmental Policy Rules Act Rules proceeding (NEPA Order), we will not require further environmental review under the National Environmental Policy Act (NEPA) for SpaceX's Starmind system.Paragraph 14
Q18S2 DA 26-1273concluded that Commission-licensed space-based operations do not constitute a major Federal action (MFA)Paragraph 14, describing FCC 26-64. The order's own sentence continues 'as "extraterritorial activities,"' — that nested term is rendered in the article as unquoted narrative rather than a second-order quotation, so the span above stops at (MFA).
Q18bS2 DA 26-1273and thus do not trigger the agency's NEPA obligations.Paragraph 14, the continuation of the same sentence
Q19S2 DA 26-1273dismiss arguments on the record that the Commission must conduct an environmental review of the proposed ODC system pursuant to its NEPA obligations.Paragraph 14
Q20S2 DA 26-1273Potential concerns related to the emissions of rocket launches and the subsequent impacts on the human environment as an indirect result of the Starmind system are outside of the Commission's purview.Paragraph 15
Q21S2 DA 26-1273Other concerns, including impacts on the atmosphere caused by satellites burning up on re-entry, remain speculative and not supported in the record.Paragraph 15
Q22S2 DA 26-1273previously held that the Commission's rules do not address the protection of optical astronomyParagraph 16, closing lines — the second of the two grounds given there
Q23S2 DA 26-1273We find that these concerns regarding potential non-spectrum related impacts are outside the scope of the ODC's radiofrequency operations.Paragraphs 16-17, AAS infrared argument
Q24S1 FCC news releaseis continuing to review additional orbital data center proposals and intends to issue decisions on each expeditiously according to the agency's regular procedures.Release, closing paragraph
Q25S2 DA 26-1273no later than November 25, 2033Condition 10(a), first operational station
Q26S2 DA 26-127310% of the maximum number of authorized space stationsCondition 10(b)
Q27S2 DA 26-1273no later than November 25, 2035Condition 10(b), the deadline for the 10% milestone
Q28S2 DA 26-127350% of the maximum number of authorized space stationsCondition 10(c)
Q29S2 DA 26-1273no later than November 25, 2038Condition 10(c), the deadline for the 50% milestone
Q30S2 DA 26-1273no later than November 25, 2040Condition 10(d), the deadline for the remainder
Q31S2 DA 26-1273We find that these commitments are sufficient to alleviate concerns on the record with respect to optical astronomy and accordingly decline to impose additional conditions on the Starmind system.Paragraph 16 — the merits finding on optical astronomy
Q32S2 DA 26-1273IT IS FURTHER ORDERED that the Petitions to deny filed by Viasat, Inc., Kuiper Systems LLC, and the American Astronomical Society are DENIED.Ordering clause 20

Canonical URL

https://www.thehumansarefine.com/articles/fcc-starmind-orbital-data-centres-2026-11-26-evidence.html

Revision history

  • r1 — first draft, written on 26 November 2026 from the two FCC primary documents released on 25 November 2026: the news release and the accompanying order DA 26-1273, both read in full. CNBC and Ars Technica are used only for the figures and petition details the primary documents do not print, and each is named where it is used.
  • r2 — second revision, 26 November 2026. The first independent review returned REVISE with three blocking findings, all corrected here. The deployment schedule was wrongly described as absent from the order and attributed to Ars Technica; Condition 10 prints it directly, and the article now quotes it, including the 50%-by-November-2038 milestone that both the earlier draft and the Ars report omitted. The petitions to deny were described as not granted; ordering clause 20 denies all three by name, and the article now says so and cites where the order engaged their substance. The optical-astronomy finding was summarised as purely jurisdictional; paragraph 16 in fact holds that SpaceX's coordination commitments are sufficient to alleviate the concerns, and that merits finding is now quoted alongside the jurisdictional ground. The evidence table rows carrying the two wrong propositions were corrected, three style notes were answered, and a duplicated byline removed.